2021 Street Resurfacing Project

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

 

The Town of Portola Valley will be performing street resurfacing on various roadways  from August 23 – October 15, 2021

This project will consist of asphalt repairs and applying surface seals to the road surface.  The repairs will include grinding worn areas, crack sealing, a surface seal treatment, and repainting traffic markings.

A list of streets that will be resurfaced are posted below. The contractor will be hand delivering printed notices to residents 2 days in advance indicating the exact date your street is scheduled for the surface seal treatment phase (slurry seal) which will affect street access until the surface has cured and dried enough to allow traffic (typically 4-5 hours). On the surface seal date, we ask that you to make parking and schedule arrangements to avoid the work area and to turn off irrigation that would cause water runoff onto the street.  Please do not water or drive on surfaces until dried, it will affect the final look of the product and track onto surfaces. The garbage company typically will pick up garbage earlier that day if your street is affected. 

Traffic will have limited access through those streets during the street resurfacing process. Traffic controls within the construction area will be in place.

We are aware that there will be residents who will be inconvenienced by the street resurfacing work and we ask for your cooperation and understanding. These improvements will result in an improved street that will serve the area for many years. 

 

Work on November 10, 2021
Traffic Delays and Road Closures
Damage and Wear to the Roads
Street Project Surface Seal Methods
What is Slurry Seal?
The Construction Process
Asphalt Grind & Overlay Methods
Condition Evaluations
How Streets Are Selected for Projects
Contact
Street list for Surface Seal Treatment - See Above Schedule
Crack and Slurry Seal Completed